Saint Mary’s campus undergoes renovation

first_img Johnson said new closed circuit cameras were added to the Angela parking lot. These cameras were requested by students several years ago to create a safer environment in the parking facility.  Regina Hall was the recipient of some new furniture. The College also repaired several sidewalks after requests from students last spring.  The College applied it, Johnson said. In addition to the cameras, card access was added to Angela Athletic Center. Johnson said several buildings were upgraded. The roofs of Moreau Hall and the Science Hall are being replaced, and other building renovations include a new air handling system installed in Holy Cross Hall to better circulate fresh air throughout the building. The radiators in Holy Cross Hall were removed as well, allowing new convection heating units to be installed in every room. “All the work benefits the students, whether it is providing a more comfortable learning or living environment, or providing a safer campus,” Johnson said.  Johnson said Lake Marian was cleaned during the summer as well. Silt was removed from the lake and will be used as filler around campus. After several severe storms during June, seven trees were removed from campus and will be replaced, Johnson said. Karen Johnson, vice president for student affairs, said most of the work was done during the summer, though students may still see some continuing into the fall. Many of the changes were made to directly benefit students, while others benefited students more indirectly and were designed to add beauty to the College. “I absolutely think these things improve the campus,” Johnson said. “Any time you make upgrades and repairs you improve the campus environment.” Students returned to the Saint Mary’s campus to find some changes. Additionally, the College changed the landscaping in several different areas on campus. Johnson said this was to remove old or overgrown plants. The Nature Trail received new markers, and foliage around the trail was trimmed.last_img read more

MARK ENGLISH LEAVES IT LATE TO PROGRESS IN U23 EURO CHAMPIONSHIPS

first_imgMark English left it late but has qualified for the semi-finals of the European U23 Championships in Estonia.Mark EnglishThe Letterkenny man came home in third place in the 800 metres, after a strong finish in the home straight.English qualified with a time of 1.52.91 to secure his place in the semi-finals. He is three seconds off the pace and will ned to improve if he is to reach the final.MARK ENGLISH LEAVES IT LATE TO PROGRESS IN U23 EURO CHAMPIONSHIPS was last modified: July 10th, 2015 by StephenShare this:Click to share on Facebook (Opens in new window)Click to share on Twitter (Opens in new window)Click to share on LinkedIn (Opens in new window)Click to share on Reddit (Opens in new window)Click to share on Pocket (Opens in new window)Click to share on Telegram (Opens in new window)Click to share on WhatsApp (Opens in new window)Click to share on Skype (Opens in new window)Click to print (Opens in new window)last_img read more