Xining environmental comprehensive treatment project through the pre evaluation of the World Bank ex

day before the comprehensive management of water resources by senior expert Zhang Ximing as the head of the Xining World Bank officials, using the world bank loan project of the world bank pre assessment delegation arrived in Xining, the project was pre assessment period of nearly two weeks. The afternoon of October 18th, the project will be held before the conclusion of the assessment, Xining environmental comprehensive utilization of the world bank loan project successfully passed the pre assessment for the next step to lay a solid foundation for formal assessment. Vice mayor Xu Guocheng attended the meeting.

Since the start of last year, the comprehensive utilization of the world bank loan project in the Xining

has been established in the city as a leader of the mayor, deputy mayor and deputy mayor of the city. Over the past year, the world bank to identify the mission, the identification group, the preparation of the city to inspect and guide the project preparation of the views and suggestions. In accordance with the requirements of the memorandum of inspection made by the world bank during the inspection period, the city has accomplished a great deal of fruitful work.

through the pre assessment of nearly two weeks, the pre assessment team leader Zhang Ximing said that the Xining project from the pre identified pre assessment only a short period of one year, compared with some other parts of the Xining project, the progress of the work very fast. At present, the aim of the project is to improve the urban water environment infrastructure, reduce water pollution in Xining, demonstrate the use of reclaimed water in Xining, and improve the level of environmental services in Xining. Project plan: water city rainwater sewage collection pipe network project, low impact development and Beichuan river restoration project, sewage reuse project, ditch comprehensive management project, project management and construction ability etc.. Through in-depth study of this project, repeated planning, in the idea, technology and methods are expected to achieve new breakthroughs, new innovations. Xu achievements of the world bank for the development and construction of Xining to provide support and help to express my heartfelt thanks, and said that the project must be carried out well, the project made of a demonstration, representative and innovative projects. (author: Xiao Yan)

 

Leave a Reply

Your email address will not be published. Required fields are marked *